refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 2651 تا 2660 از 2718 نتیجه یافت شده برای v:
v: to release pipe that is stuck in the hole by running washover pipe. The washover pipe must have an outside diameter small enough to fit into the borehole but an inside diameter large enough to fit over the outside diameter of the stuck pipe. A rotary shoe, which cuts away the formation, mud, or whatever is sticking the pipe, is made up on the bottom joint of the washover pipe, and the assembly is lowered into the hole. Rotation of the assembly frees the stuck pipe. Several washovers may have to be made if the stuck portion is very long.

v: A type of milling operation in which the outer surfaces of a plug or similar fish are milled with a circular hollow mill. By including wash pipe in the tool string, the mill face can reach over the body of the fish until it can be pushed to bottom, or unt

a recovery process in which a larger pipe is used with circulation to surround and capture a pipe stuck in sand or cuttings. Circulation is critical to washing the sand from around the fish. Can be used with normal or reverse circulation.

دور شویی کردن

n: 1. the high-pressure spraying of the crude oil cargo to dislodge or dissolve clingage and sediment from the walls, cross members, and lines in the compartments of a vessel during the unloading operation. 2. the use of a high-pressure water stream to dislodge clingage and sediment from the bulkheads, bottoms, and internal structures of a vessels cargo tanks.

forced circulation of fluid through the perfed interval with the intent of generating communication between perforations or intervals.

assets that will lose or are losing their value.

n: a reduction in the permeability of a formation caused by the invasion of water into the pores.

n: A condition caused by an increase in water saturation in the near-wellbore area. Water block typically forms during the drilling phase of a well, when the near-wellbore area is exposed to a relatively high volume of filtrate from the drilling fluid. The i

a relative permeability problem usually occurring in a gas zone. Highest potential formations for water blocks are low pressure gas sands (<0.25 psi/ft pore pressure),with small pore throats (<10 microns),lower permeability (<100 md),and when using wat

n: the upward encroachment of water into a well caused by pressure drawdown from production.

movement of water upward into oil strata in response to production of oil and lower reservoir pressures. May be localized in areas of high vertical permeability.
پیشرفت مخروطی

n: (W/C) water put into an empty string of pipe in a wellbore to prevent the pipe from being crushed by pressure in the annulus.

n: A volume of water placed in a tubing string prior to conducting a drillstem test or opening a well to flow. The water cushion is designed to reduce and control the pressure drawdown applied to the reservoir when the downhole valve or tester valve is opene

a level of water in a string to be used for flowback to generate an initial damping back pressure.
آب ضربه گیر

n: the percentage of water in fluid produced from a well. v: to locate the oilwater interface and use the location to measure the volumes of oil and water in a shore tank or ship compartment.

the amount of water in percent in a produced fluid stream.

n: It be used to decrease the viscosity of the drilling fluid and convenient to separate.

n: a pressure concussion caused by suddenly stopping the flow of liquids in a closed container.

a sharp, sometimes very high force and pressure load that is created when a valve is closed too rapidly in a flowing stream. The major force occurs behind the valve. Most common in a production well when sudden closure (slam closure) of a subsurface safet



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.